How many days does it take to complete a work?

How many days does it take to complete a work?

Thus A and B will take 12/7 days to complete a work, i.e. 1 day 17 hours (approximately). If A and B together can complete a work in 18 days, A and C together in 12 days and B and C together in 9 days, then in how many days B alone can do the work?

How many days does it take to do 100\% work?

Hence, the work will get completed (100\% work) in 4 days WORK EQUIVALENCE METHOD : Work rate × Time = Work done (or work to be done) A contractor estimates that he will finish the road construction project in 100 days by employing 50 men.

How much work will A and B do in 8 days?

READ:   What is the difference between bypass surgery and angiography?

A’s one day work will be 5\%, while B will do 6.66 \% of the work in one day. Hence, their total work will be 11.66\% in a day. In 8 days they will complete Æ 11.66 × 8 = 93.33\% This will leave 6.66\% of the work. This will correspond to 4/7 of the ninth day since in 6.66/11.66 both the numerator and the denominator are divisible by 1.66.

How many days RAM and Ravi can do a work?

Ram and Ravi can do a work in 20 and 25 days respectively. After doing collectively 10 days of work, they leave the work due to illness and Suresh completes rest of the work in 3 days. How many days Suresh alone can take to complete the whole work?

A work could be completed in 100 days by some workers. However, due to the absence of 10 workers, it was completed in 110 days. The original number of workers was : – Competoid.com

READ:   What are the pain points of eCommerce businesses?

How many workers can finish a work in 30 days?

Originally Answered: 20 WORKERS can finish a work in 30 days. after how many days should 5 worker leave the job so the work is completed in 35days.

How many days does it take to do half the work?

Half work is done in 30 days it means full work will be done by X men in 60 days. Now, P can do a piece of work in 20 days. Q is 25 percent more efficient than P. In how many days half the work is completed when both are working simultaneously?

How many workers are required to build a 5 km road?

8). A road of 5 km length will be constructed in 100 days, So 280 workers were employed. But after 80 days it was found that only 3 1 2 km road was completed. Now how many more people need to finish the work in specified time?